Sunday, November 11, 2012

100 Day Hustle - Half Way There!


So, when I did my original 100 Day Hustle post I had grand visions of getting everything on the list accomplished, and then some.  Here is what I've done from my original list, a change and an extra, too.

1. A belated birthday quilt for my niece (DONE!).

  

2. Quilt and bind Do. Good Stitches September Quilt (DONE!).
                  
                                     
                                     

3. Finish churn dash quilt (no progress).

4. Make zig zag AMH flannel quilt (no progress).

5. Make Field Study/Indie gathering flowers quilt (no progress).

6. Make portable car/train play mat for X's birthday (changed to a birthday monster shirt - DONE!)

                                  

7. Finish Sherbet Pips quilt (no progress).

8. Make October Do. Good Stitches blocks (DONE!)

9. Finish and frame ABC Daisychain Embroidery for C (DONE!)


10. Finish knitting To Infinity and Beyond cowl (no progress).

11. Make X's Halloween snowman costume (not on original list, but DONE!)


So, not quite as much as I had hoped, and a few items with no progress will most likely be taken off of the list entirely or switched to something else, but I'm quite happy with what I've accomplished so far!  Good luck to everyone on the rest of the Hustle!




3 comments:

  1. This is a great list and that snowman costume is super cute! My list is changing, too. I think I had high hopes when I wrote mne.

    ReplyDelete
  2. Awesome work!! The quilts are beautiful. I love your sampler and the frame you used is perfection!

    ReplyDelete